Energy Conservation Feasibility Studies

ITT has a wide experience in the revamping of the existing haters in order to:

  • Improve safety and reliable operations
  • Increase the heaters capacity/duty
  • Improve the overall thermal efficiency.

The type of revamping defends from the investment cost compared with the pay-out period, feasibility study can be performed by ITT.

Main items for the revamping are the following:

  • One (or two) forced draft fan relevant motor and air intake
  • One induced draft fan
  • One flue gas/air exchanger
  • New burners suitable for forced draft operation
  • One stem /air exchanger (only for particular conditions due to sulphur in the fuel burned)
  • Flue gads and air ducting system
  • Instrumentation
  • Casting and lining repair works - re-tubing.

Services provided by ITT:

  • Feasibility study
  • Thermal check of the heaters before and after revamping
  • Detailed engineering (mechanical, thermodinamical and instrumental)
  • Material procurement
  • Procedure for fabrication
  • Supervision of fabrication up to the mechanical completion.